Introduction to membrane structure engineering of Tai’an Shubar

Recently, the Yexing-Tai’an Shubar membrane structure project was quietly completed. Projects with the word “book bar” are destined to be designed to be exquisite and elegant, and also need skilled craftsmen to carry out construction and carving. The completion of the project is the result of nearly a month of silent struggle in the mountains by our Yexing membrane structure project team. Today, Xiaobian will take you to make a retrospective analysis of the project.

Original architectural renderings

20190621153523_0915

Original architectural view

20190621154135_8178

Project introduction: Tai’an Shubar membrane structure project is a comprehensive project integrating viewing, reading, leisure and entertainment, which not only has the modern atmosphere of the membrane structure building itself, but also has the exquisite elegance given by the superb skills of the designer and builder, giving people a fashionable and chic but restrained and simple look. The roof of this project is streamlined, with a construction area of about 600 square meters. The outer film adopts white environmental protection film imported from Germany, the inner film adopts PTFE inner film, and the middle is added with thermal insulation layer, and the inner film needs to be installed with light. Below the roof is a fully enclosed space, and the walls are in the form of floor-to-ceiling glass, which can obtain excellent views from all angles

Engineering difficulties:

Difficulty 0: The outer membrane closure needs to be wrapped 5.<> meters into the cornice (as shown below).

20190621153601_7017

Difficulty 2: The overall membrane surface needs to be free of folds and the membrane unit connection should not leak any metal connectors, and be overly flat. (as shown below)

20190621153616_2455

Difficulty 5: The gap between the inner membrane unit does not exceed <>mm (as shown in the figure below).

20190621153631_0044

Difficulty 4: The limitation of the operating space of the inner membrane makes it difficult to install.

Difficulty 5: In order to achieve the overall effect of the inner membrane, the inner membrane node process is complex and the accuracy requirements are high.

Difficulty 6: The overall building requires precision from steel structure processing to joint process to measurement and cutting processing.

20190621153658_6019

Build an excellent living space for human beings and let the world fall in love with Ye Xingzuo! Although Tai’an Book Bar is a small landscape membrane structure project, making a classic case that touches customers is still the principle we have always adhered to and practiced. 

Need a tensile membrane solution for your project?

Tell us your requirements — we reply with a free quote within 24 hours.

Back
WhatsApp

+852 69447081

Message Email

yexing01@yexingms.com

Top

Leave us a Message

We usually reply within 24 hours.

Contact Form